Phase II ESA of Former Automotive Repair Facility
- Details
- Category: Phase II - Environmental Site Assessments (ESAs)
Cleveland Partners, LLC
Dallas, Texas
This site consisted of a 0.66 acre tract of commercially developed land. The purpose of the assessment was to supplement a Phase I ESA with the collection and analysis of groundwater and soil samples. dse gauged and sampled two monitoring wells and sampled shallow soils in four areas of possible impact identified in the Phase I ESA where former equipment and a drainage swale were located. dse reviewed state, city and previous contractor’s documents to validate previous findings. These documents also stated that an UST was previously installed at the site, which could have been another possible contamination source.
What's New!
-
dse graduates from SBA's e200 initiative
3 months ago -
dse to offer training for environmental consultants. Stay tuned!
3 months ago -
Register for special access!
8 months ago