TCEQ Compliance
- Details
- Category: Phase III - Cleanup and Remediation
Craig's Cleaners
Houston, Texas
This site is an operating dry cleaner that used PCE for approximately 20 years. A site assessment at an adjacent property indicated that PCE had been released and the client was instructed to perform an assessment by the TCEQ. dse performed an extensive assessment of the affected soil and groundwater that included the installation of more than 20 groundwater monitoring wells located both on-site and off-site. dse prepared and submitted the required documents to the TCEQ and performed extensive quarterly groundwater sampling using low-flow techniques. The sampling results enabled dse to provide groundwater modeling and predict the migration of the contaminant plume. A soil vapor extraction system was designed and installed followed by injections of Regenesis HRC and HRC-X into the groundwater to reduce the amount of impact at the site.
What's New!
-
dse graduates from SBA's e200 initiative
3 months ago -
dse to offer training for environmental consultants. Stay tuned!
3 months ago -
Register for special access!
8 months ago