UST Remediation - Kinny’s Convenience Store
- Details
- Category: Aboveground/Underground Storage Tank (AST/UST) Installation, Repair, Removal and Remediation
TY Equity Group (Cooper Medlin)
Arlington, Texas
Three USTs were removed from the site and three new 8000 gallon USTs were installed in 1984. These activities were performed before removal of USTs was regulated by the TCEQ. The TCEQ required remediation of the hydrocarbons detected in soil and groundwater samples which were believed to be the result of improper removal of the USTs. dse provided project management, well drilling, quarterly groundwater sampling events, TCEQ required reports, and closure activities.
What's New!
-
dse graduates from SBA's e200 initiative
3 months ago -
dse to offer training for environmental consultants. Stay tuned!
3 months ago -
Register for special access!
8 months ago