Aboveground/Underground Storage Tanks
AST Removal and Installation
Silverking Productions Inc., KHSX TV-49
Cedar Hill, Texas
dse was hired to remove, relocate and re-install an existing 2000 gallon diesel-containing AST, emergency generator and underground piping. The Potential environmental impacts from the AST on the former and new tank locations were also identified. dse visually observed no evidence of previous leakage or spills in the vicinity of the AST on either site. No fuel spillage or leakage occurred at either site during emptying, removal, re-installation and refilling of the tank. dse reviewed site history records, tank closure report and acquired all required registrations and permits to complete the work. The field efforts included trenching, installation and pressure testing the new piping system.