Compliance

Site Investigation, Monitored Natural Attenuation, Plume Management Zone, TCEQ Voluntary Cleanup Program (VCP)

Former Craig's Cleaners

Katy, Texas

Workers install a groundwater monitoring wellThis site is a former dry cleaner that used PCE. A prior site assessment at the property indicated that PCE had been released. dse performed an extensive assessment of the affected soil and groundwater that included the installation of 18 groundwater monitoring wells located both on-site and off-site. dse prepared and submitted the APAR to the TCEQ and performed extensive quarterly groundwater sampling using low-flow techniques. The sampling results enabled dse to design a monitored natural attenuation program for the site. A PMZ was designed and proposed based on the results of groundwater modeling performed by dse.

Dallas Headquarters

3902 Industrial St., Suite A
Rowlett, Texas 75088
Phone: 972-412-8666
Fax: 972-412-8660
Toll Free: 877-373-3734

 

Ft. Worth Branch

414 North Main St., Suite 216
Euless, Texas 76039
Phone: 817-540-4100
Fax: 817-540-4101

 

Jacksonville Branch

701 San Macro Blvd., Ste. 1205
Jacksonville, Florida 32207
Phone: 972-412-8666
Fax: 972-412-8660