Site Assessments

Site Closure for Chlorinated Solvent Contamination

1 Hour Martinizing

Hurst, Texas

Remediation at a Dry Cleaning SiteIn this project, chlorinated hydrocarbon impacts were discovered in the soil and shallow surface infiltration water which were attributed to the on-site dry cleaning operations. Remedial design included excavation of impacted soils (>10 feet below grade) located beneath the building’s slab and installation of a single 10” SVE well and system (shown above) which reduced contaminant levels in remaining impacted soil by more than 60% in the first three months. dse also designed the SVE system and had it manufactured to design specifications, resulting in at 50% savings versus using commercially available systems.

Dallas Headquarters

3902 Industrial St., Suite A
Rowlett, Texas 75088
Phone: 972-412-8666
Fax: 972-412-8660
Toll Free: 877-373-3734

 

Ft. Worth Branch

414 North Main St., Suite 216
Euless, Texas 76039
Phone: 817-540-4100
Fax: 817-540-4101

 

Jacksonville Branch

701 San Macro Blvd., Ste. 1205
Jacksonville, Florida 32207
Phone: 972-412-8666
Fax: 972-412-8660