Water Resources

Sabine River Estates SWPPP

B&P Builders

Edgewood, Texas

dse prepared a general construction SWPPP to address requirements for conservation of soils and surface water during large scale construction. The site was approximately twenty acres of land being developed into residential property. Inspections of the control measures (silt fencing and drainage system) were conducted every two weeks and/or within forty-eight hours following a major rain event and at least once a quarter, during a rain event. These inspections were performed to see how the total drainage system, during construction, was functioning. Maintenance procedures were followed to keep the silt fencing in working order and also changed or augmented silt fencing, as needed, based off results of the inspections.

Dallas Headquarters

3902 Industrial St., Suite A
Rowlett, Texas 75088
Phone: 972-412-8666
Fax: 972-412-8660
Toll Free: 877-373-3734

 

Ft. Worth Branch

414 North Main St., Suite 216
Euless, Texas 76039
Phone: 817-540-4100
Fax: 817-540-4101

 

Jacksonville Branch

701 San Macro Blvd., Ste. 1205
Jacksonville, Florida 32207
Phone: 972-412-8666
Fax: 972-412-8660