Water Resources
Sabine River Estates SWPPP
B&P Builders
Edgewood, Texas
dse prepared a general construction SWPPP to address requirements for conservation of soils and surface water during large scale construction. The site was approximately twenty acres of land being developed into residential property. Inspections of the control measures (silt fencing and drainage system) were conducted every two weeks and/or within forty-eight hours following a major rain event and at least once a quarter, during a rain event. These inspections were performed to see how the total drainage system, during construction, was functioning. Maintenance procedures were followed to keep the silt fencing in working order and also changed or augmented silt fencing, as needed, based off results of the inspections.
Related Work
What's New!
-
dse graduates from SBA's e200 initiative
6 months ago -
dse to offer training for environmental consultants. Stay tuned!
7 months ago -
Register for special access!
11 months ago